HUNGAROCONTROL ANS III. INTERIOR DESIGN

Location Budapest
Client Hungarocontrol
Floor area 11 000 m2
General design Zsuffa és Kalmár Építészműterem
Interior design MCXVI Architects
Leading interior designer Gábor Szokolyai
Interior designer Dénes Kovács
Project phase Completed
Project year 2012
Photography Tamás Bujnovszky

Air traffic control requires extreme attention, reliability and concentration, with high-tech infrastructure. In designing the interior spaces of the building Hungarocontroll ANSIII. this engineering approach could only be the guiding principle of design. Yet there is some hidden experience in flying over the clouds. This inspired the building’s central lobby area.